By the Estimate Templates editorial team · Last updated · Formulas checked against worked examples
What to include in a remodeling estimate
Our remodeling estimate template covers the basics every estimate needs (your details, the customer, job site, line items, totals, validity date and signature) plus the details customers in remodeling look for:
- Allowances for finishes the customer still has to pick, with the amount
- How hidden damage found during demolition is handled
- Phases and a rough schedule
- Protection of the rest of the home and daily cleanup
- Deposit and progress payments
Sample remodeling estimate
Job: Hall bathroom remodel. Gut and remodel the hall bathroom: remove existing finishes, replace shower valve and drain, waterproof and tile the shower and floor, install new vanity, toilet and fixtures, patch and paint.
| Line item | Qty | Rate | Amount |
|---|---|---|---|
| Demolition and haul-away | 1 lot | $1,400.00 | $1,400.00 |
| Plumbing: new valve, drain and supply lines | 1 lot | $1,850.00 | $1,850.00 |
| Tile: shower walls and floor, labor | 140 sq ft | $14.00 | $1,960.00 |
| Tile allowance (customer selects) | 140 sq ft | $6.00 | $840.00 |
| Vanity, toilet and fixtures, install | 1 lot | $900.00 | $900.00 |
| Fixture allowance | 1 lot | $1,500.00 | $1,500.00 |
| Heated floor mat and thermostat (optional) | 1 ea | $950.00 | $950.00 |
| Estimate total (optional items not included) | $8,450.00 | ||
Example prices are for illustration only and are not price guidance; costs vary widely by region, materials and job. Exclusions in this sample: Hidden rot, mold or code corrections found after demolition (quoted separately), relocating walls, electrical panel upgrades.
Remodeling estimating tips
Use allowances for tile, fixtures and lighting so you can price the job before the customer has chosen everything. State that the final price adjusts up or down to their actual selections.
Spell out how hidden conditions are priced. A short clause saying rot, mold or code issues found after demolition will be quoted as a change order saves arguments later.
Once the customer accepts, bill the job with a matching invoice from Excel Invoice Maker, or convert the estimate in one click with Estimate Pro.
This template is a general business document, not legal advice. Licensing, contract and deposit rules vary by state; check what applies to your trade.